MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.

Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc., This news data comes from:http://www.771bg.com
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
- Motive probed for US shooting that killed two children, injured 17
- Meeting South Korea, Trump could eye new chance with North
- DPWH fires Bulacan engineers, blacklists contractors over anomalous projects
- Head of main US health agency abruptly dismissed
- Manila marks National Heroes Day with job fair
- No winner in Ultra, Megalotto draws for Sept 5
- Ukraine offers to co-produce drones with Philippines for maritime patrols
- Sen. Hontiveros pushes for Philippine Geriatric Center to aid seniors
- Some areas in Metro Manila, 5 provinces to have power interruptions due to maintenance works
- Floods kill over 30 in Indian-controlled Kashmir, displace 150,000 in east Pakistan